Medium-sized Plants

Below you will find some examples of GEH® plants for treating amounts of up to 150 m3/h.

2 adsorbers in parallel operation

  • Capacity: 110 m3/h at 600,000 m3/year
  • Replacement interval: 2.6 years
  • GEH® bed volume:  2 x 7 m3
  • Initial operation: 1998


2 adsorbers in parallel operation

  • Capacity: 45m3/h at 200,000 m3/year)
  • GEH® bed volume: 2 x 1,2 m3
  • Initial operation: 1998


2 adsorbers in parallel operation

  • Conversion of an existing filter system for arsenic removal
  • Capacity: 40 m3/h
  • GEH® bed volume: 1 m3
  • Initial operation: 1997


Single-adsorber plant

  • Capacity: 14 m3/h
  • Replacement interval: 3,5 years
  • Treatment capacity: 140,000 bed volume
  • GEH® bed volume: 0.8 m3
  • Initial operation: 1998


Manually operated plant

  • Capacity: 14 m3/h
  • GEH® bed volume: 0.9 m3
  • Initial operation: 2000
Medium-sized Plant 1

 

Medium-sized Plant 2

 

Medium-sized Plant 3

 

Medium-sized Plant 4

 

Medium-sized Plant 5